DECISION No. 41/2002/QD-BCN of October 4, 2002 promulgating the Regulation on the inspection and pre-acceptance test of the volume of encallowed soil and rock as well as the output of coal exploited at open-cast mines

The Regulation on the inspection and pre-acceptance test of the volume of encallowed soil and rock as well as the output of coal exploited at open-cast mines, issued together with this Decision, applies to enterprises which exploit coal by open-cast mining method or which are being in the process of capital construction in preparation for open-cast mining.

The inspection and pre-acceptance test of the volume of encallowed soil and rock as well as the output of coal exploited at open-cast mines must be determined by measuring method. The measurement figures shall be the official figures used for the calculation of exploited coal output as well as encallowed soil and rock volume.

This Decision replaces the Electricity and Coal Ministry�s Decision No. 96-DT/KT1 of March 10, 1972 promulgating the Regulation on the inspection and pre-acceptance test of the volume of encallowed soil and rock as well as coal output at open-cast mines.- (Summary)

Thuộc tính văn bản

Số ký hiệu
41/2002/QD-BCN
Loại văn bản
Bản dịch văn bản
Cơ quan ban hành
Bộ Công nghiệp
Ngày ban hành
04/10/2002
Ngày có hiệu lực
19/10/2002
Tình trạng hiệu lực
Còn hiệu lực
Phạm vi
Trung ương
Lĩnh vực
Chưa phân loại
Chức danh người ký
Đang cập nhật
Người ký
Đỗ Hải Dũng

Lược đồ quan hệ

Chưa có thông tin quan hệ với văn bản khác.